Knowledge

Construction method and technique of anchor bolt grouting

Nov 08, 2020 Leave a message

The construction method of anchor bolt grouting is also mixing in the early stage. The issues that need to be paid attention to during the mixing process are as follows:

▲Mixing

1. When mixing cement-based grouting materials, add water according to the required water consumption of the product.

2. Cement-based grouting materials should be mechanically mixed. When mixing, it is advisable to add 2/3 of the water and mix for about 3 minutes, then add the remaining water and mix until uniform. If there are specific mixing requirements for AGM-290 products, they should be mixed according to their requirements.

3. The mixing site should be close to the grouting site.


▲Anchor grouting for anchor bolts

1. The construction process of anchoring anchor bolts should meet the following requirements:

①Clean hole one

②Clean up water in the hole

③Remove oil stains and rust on the bolt surface

④ Insert bolts to adjust and fix one

⑤Mix AGM-290 grout one

⑥Burning and building one⑦Conservation one

⑧ Install equipment.

2. When the anchor bolts are formed into holes, the horizontal deviation of the bolt holes should not be greater than 5mm, and the vertical deviation should not be greater than 5°. The bolt hole walls should be rough, and the holes should be cleaned without any impurities such as floating dust and oil. Use water before grouting. Soak for 8-12h to remove water in the holes. When the ambient temperature is lower than 5°C, measures should be taken to preheat and the temperature should be kept above 10°C.

3. Before grouting, remove the oil stains and rust on the surface of the anchor bolts.

4. When pouring the mixed cement-based grouting material into the bolt hole, the position of the bolt can be adjusted as needed. Vibration is strictly prohibited during the grouting process, and the bolts must not be adjusted again after grouting.

5. The upper surface of the grouting layer in the hole should be about 50mm lower than the surface of the foundation concrete.


The key points that need to be paid attention to are the maintenance work after grouting:

Winter construction

When the average daily temperature is lower than 5°C, construction should be carried out in winter and meet the following requirements:

1. Before grouting, measures should be taken to preheat the surface of the foundation to keep the temperature above KTC and remove the accumulated water.

2. Before freezing, the compressive strength of cement-based grouting materials shall not be lower than 5MPa.


High temperature climate environment construction

If the temperature of the grouting part is greater than 35°C, the construction should be postponed according to the high temperature climate and meet the following requirements:

1. Take measures 24 hours before grouting to prevent the grouting part from direct sunlight or other heat radiation.

2. Take appropriate cooling measures, and the temperature of the concrete foundation and equipment floor in contact with cement-based grouting materials should not be greater than 35°C.

3. The entering temperature of the slurry should not be greater than 30°C.

4. Moisturizing and maintenance measures should be taken in time after grouting.